Work / 02

Bridgeside

Award-winning student accommodation in Nottingham, from naming to installation.

Bridgeside

Client

LUNA

Year

2025

Place

Nottingham

Scope

Naming, Wordmark, Hoardings, Mesh banners

Guidance contributed to brand development and delivered the wordmark, hoarding installation and large-scale mesh banners for a Nottingham student accommodation development.

7

hoarding zones surveyed, made and installed

25/26

fully let for the academic year

Day one

QR enquiries arrived before the installation report was written

Challenge

Visibility in a crowded market while the building was still going up.

Bridgeside is a purpose-built student scheme in Nottingham, next to a distinctive pedestrian bridge and the University’s Jubilee Campus.

It needed immediate visibility in a crowded student housing market, and it had to establish a brand presence while still under construction. The client needed a name that anchored the development to its location, a wordmark that worked at scale across hoardings and building wraps, and a partner who could move quickly across several stages of the project.

Approach

Brought in where we were most valuable, stage by stage.

We worked at several points: brand development, wordmark design, site survey and installation. The staged engagement let the client align spend with construction milestones rather than commit to scope upfront.

We contributed to the naming that produced Bridgeside, after the adjacent bridge, giving the scheme instant geographic clarity. The wordmark takes its letterforms from the bridge’s steelwork, and holds up at street-level hoarding size and at building height.

Following survey, we manufactured and installed ACM panel hoardings across seven zones, working around existing site infrastructure and health and safety requirements. Large-scale mesh banners on the facade gave the scheme upper-level visibility.

Result

Site presence that performed from day one.

The client reported QR code engagement from the hoardings before the installation report had even been written: the work was generating enquiries while the building was still under construction.

The scheme is visible across every sightline, street level for pedestrians and upper level for distance. It is now fully let for 25/26.

In autumn 2026 Bridgeside won the Design Excellence Award at Insider’s East Midlands Property Dinner and Sustainable Development of the Year at the East Midlands Bricks Awards, where its developer, OMNI Developments, was also Overall Winner.

Site presence built to perform from day one, across every stage of delivery.

Next project

Brigade House