Work / 03

Brigade House

A construction hoarding on Kirkstall Road, measured panel by panel.

Brigade House

Client

LUNA

Year

2026

Place

Kirkstall, Leeds

Scope

Survey, Hoardings, Production, Installation

Guidance surveyed, specified, produced and installed the construction hoarding for Brigade House, a LUNA student scheme on Kirkstall Road in Leeds, opening in 2027.

75 m

of hoarding measured across five elevations

1220 × 2440

millimetre panels, with every odd end measured to fit

2027

the opening the hoarding is selling

Challenge

A long, broken run of hoarding on a busy road.

Brigade House sits on Kirkstall Road, one of the main routes into Leeds city centre. The site was already enclosed by the contractor’s black timber hoarding, running in five separate elevations around the entrance, the road frontage and the neighbouring buildings.

LUNA needed the scheme seen and enquired about while it was still under construction, using the structure that was already there.

Approach

Survey first, so the artwork lands on the panels.

We surveyed every elevation and drew it up panel by panel: standard 1220 by 2440 millimetre sheets, and the odd widths at each end and around the entrance, down to a 175 millimetre filler.

The artwork run was set to that survey, so messages, photography and QR codes sit on whole panels rather than across joins. Panels were printed on 3 millimetre Dibond with a gloss anti-graffiti laminate, then delivered and fixed to the existing timber structure.

Result

Runs of LUNA along Kirkstall Road.

The LUNA panels sit in runs within the contractor’s hoarding, on the road frontage and at the corner by the site entrance, each carrying Brigade House, its 2027 opening and a QR code to the booking site.

It also points passers-by to LUNA’s other Leeds schemes, Burley Studios and Trapezium, so one site works for the whole city portfolio.

Measured to the panel, so nothing lands on a join.

Next project

Medici